The project involved the installation of 18,500 LF of watermain and 26,000 LF of forcemain by Horizontal Directional Drill. Pipe sizes ranged from 12” to 16”. The project ran along FDOT SR82, requiring close coordination with the Florida Department of Transportation, Lee County, and the City of Labelle. Maintenance of Traffic along this heavily traveled road was critical to the success of the project.
3,983 LF of 12” HDPE
800 LF of 12” HDPE
855 LF of 12” HDPE
810 LF of 12” HDPE Force Main
795 LF of 16” HDPE Water Main
1,988.10 LF of 12” HDPE Force Main
810 LF of 16” HDPE Water Main
1,122 LF of 12” HDPE Force Main
983 LF of 12” HDPE Force Main
1,121 LF of 16” HDPE Water Main
1,716 LF of 16” HDPE Water Main
920 LF of 16” HDPE Water Main
1,872.28 LF of 12” HDPE Force Main
878.05 LF of 16” HDPE Water Main
803.95 LF of 12” HDPE Force Main
1,907.26 LF of 16” HDPE Water Main
803.91 LF of 16” HDPE Water Main
189.90 LF of 12” HDPE Force Main
157.16 LF of 12” HDPE Force Main
1,122.77 LF of 16” HDPE Water Main
As a national leader in the trenchless drilling industry, Earth View tailored our approach to complete the project effectively and efficiently.