All your subsurface needs under one roof.

Problems EV solves:

Urban Areas Construction

Dense urban communities make traditional open-cut methods tough. Our team has proven experience with trenchless drilling techniques that eliminate these challenges with low impact solutions.

Pipe and Leak Detection

Whether EV is locating unknown underground utilities or detecting water leaks, our seasoned team provides accurate layouts and assessments of buried infrastructure. This allows customers to develop viable design or utility relocation alternatives before any damage is done.

Clogged Pipes

With our HD camera inspections, EV is experienced in finding clogged and backed up lines and then cleaning them using Vacuum Excavation to leave you with flowing water and clear pipes.

Subsurface Inspections

When infrastructure fails, EV rises to the occasion to understand and then solve your problem. Using equipment, such as HD-CCTV, EV gets eyes on the hidden issues wreaking havoc on your utilities.

Utility Diagnostics

Systems don’t always perform how they should. When pipes break, avoiding additional costs is almost impossible. EV discovers issues in your utilities before they’re a problem.

Our Technology

Earth View is always looking for the next breakthrough in technology to improve how we work and add to an already experienced team.

HDD Riggs

Trenchless construction is the future of the construction industry. Since 2015, EV has successfully completed hundreds of Horizontal Directional Drills up to 42” in diameter.

HD-CCTV System

Our HD-CCTV trucks investigate, identify, and help resolve your utility pipe issues. Earth View has invested in the newest HD technology that provides higher resolution footage in 6” to 60” pipes.

GPR & Concrete Scanning

Ground and Concrete Penetrating Radar are the best ways to survey your subsurface and concrete infrastructure prior to construction. GPR and Concrete Scanning provides accurate data for well-informed decision making.

Trenchless Construction

Goodland Drive Water Main Replacement

EV installed nearly 4,000 LF of 10” and 12” HDPE water main piping with Horizontal Directional Drilling.
View project